OFFICE PROJECTS

VIEW ALL PROJECTS

VALUE: 144 Million

COMPLETED: October 2010

SCALE: 54,650 Sq. M

DURATION: 22 months

Swiss Tower incorporates the distinct characteristics of Switzerland into its visual presentation and space, an architectural form assembled in the light that’s unmistakably Swiss. A 40-storey office tower with 3 basements, each of which is split into 2 levels. The tower has a total built up area of 54,650 SQ. M, and a footprint of 1,100 SQ. M .

The first 20 levels, there are 6 “sky-gardens” / balconies every 3 levels, which alternate to be either on the North and South face of the Tower. All of the Offices at every level have a raised floor, with a false ceiling.

KEY CHALLENGES

Completing the substructure in six months and achieving a concrete slab cycle of 5 days.

MAP

TYPE: MID-Rise Project

COMPLETED: 2017

SCALE: 230,000 Sq. M

DURATION: 35 months

Dubai Wharf is a mixed-use development within the heart of Culture Village, overlooking the Dubai Creek; a district/area well known for its heritage and historic ambiance.

KEY CHALLENGES

ECC was awarded this project after the raft foundation, part of the basement slab and the retaining walls had all been completed by another contractor with major water leakages starting through the raft foundation and basement walls. The waterproofing sub-contractor failed to solve the leakage issue. ECC solved the issue.

Serious logistic problems due to the limited access to the site and insufficient space around the plot for storage of materials.

Insufficient space was available during mobilization for the site offices and other facilities. Half of the site offices needed to be demobilized in the middle of the project to allow other contractors to work.